
Investing in modernized infrastructure saves water
As the air becomes more crisp, the WID wraps up our second season of summertime construction. For the Field-Strangmuir Pipeline, long stretches of open canals are being replaced by a closed pipeline which eliminates water losses due to evaporation, infiltration and return flows. Phase 2 is done and Phase 3 is underway. Additional landowners can